2008-2009 DATA CONSULT. All rights reserved.
Outline of The Report 

INDONESIA ELECTRICITY GENERATION PROJECTS IN 2006–2015
May 2007
  


1.    CURRENT ISSUES
1.1.   Electricity Needs a Wider Basic Energy
1.2.   Demand and Supply Side Management  Has to be Considered
1.3.   Business Opportunities are Huge to be Ignored
1.4.   Biodiesel to Replace Oil Based Fuel
2.    ELECTRICITY DEVELOPMENT as shown by various indicators
2.1.   Electric Energy Sales Higher than Economic Growth
2.2.   JAVA-BALI Consumes Most of Electric Energy
2.3.   The number of Residential Customers Dominating but the Energy Consumption by the  Industrial Sector Still  Higher
2.4.   Electrification Ratio Increasing In All
2.5.   Installed Capacity has been Always Lagging Behind
2.6.   Rising Quantity of Purchased Energy  has been a Great Help 
3.     ELECTRICITY  POLICY IN INDONESIA
3.1.   Background
3.2.   The Policy of Electric Energy Production and   Procurement
3.3.   Spirit of Electricity Industry
3.4.   PLN’s Policy and Strategy
3.5.   Laws and Regulations Stipulating the Electricity Industry
4.     JAVA–BALI SYSTEM with unrealable energy supply
4.1.   Unrealable Energy Supply in Java–Bali System
4.2.   Energy Crisis has Threatened West  Java–Banten System
4.3.   Tanjung Jati  B and Cilacap Power Plants  a Great Help to Central Java–Yogyakarta
4.4.   An Overall Improvement is Necessary for East Java
4.5.   The Same Problems for Bali System
5.     FAST improvement  is needed to OVERCOME energy crisis in the Outer islands
5.1.   A Wide Aspects
5.2.   Naggroe Aceh Darusallam (NAD) Region
5.3.   West Sumatra Region
5.4.   Riau Region
5.5.   S2JB (South Sumatra – Jambi – Bengkulu)
5.6.   Lampung Region Improvement Program
5.7.   Northern Sumatra Including Aceh
5.8.   Southern Sumatra Programs
5.9.   West Kalimantan Region Development Programs
5.10.  East Kalimantan Region Program
5.11.  South and Central Kalimantan Region Program
5.12.  North Sulawesi Region Program
5.13.  South Sulawesi and South East Sulawesi Region
5.14.  In Maluku Region Program is to Repair Existing Power  and to Increase the Capacity 
5.15.  Papua Region Program is to Install more Power Plant and to  Build Additional
         Transmission and Distribution System
5.16.  West Nusa Tenggara (NTB) System
5.17.  East Nusa Tenggara (NTT) Region
6.    The roles of primary energy resources in   electricity industry
6.1.   Primary Energy Supporting the  Electricity Industry
6.2.   Coal is Expected to be the Most Important Primary Energy  for Future Electricity Industry
6.3.   Natural  Gas  Ready   to  Produce  Electricity  but  it has  Obligation to Some Countries
6.4.   Oil ha to be imported and in Increasing Volume
6.5.   Geothermal  Energy  Poses  a  Challenge
6.6.   Coal Expected to Play a Greatest Role but Biodiesel Might  Follows
7.    PHYSICAL FACILITIES  REQUIRED  TO  OVERCOME  electricity  PROBLEMs
7.1.   Background
7.2.   Assumed Growth of Population and Economy
7.3.   Electrification Ratio is Projected to Reach  100% in Most   Regions 2025
7.4.   Energy Sales to be Dominated by Industrial Sector in Java–Bali 
        and by Residential Consumers in the Outer  Islands
7.5.  Energy Balance and Generation Capacity in  Java – Bali System, 2005 – 2015
7.6.  Electric  Energy  Production  to  become  4.6 Folds  in 20 years
7.7.  Power Plant Capacity to Serve Increased  Energy Demand
7.8.  Expansion of Transmission Facilities
7.9.  More Additional Distribution Facilities are Required
8.    POWER PLANT PROJECTS   TO  rescue the   ELECTRIC ENERGY SHORTAGE
8.1.  Background
8.2.  Power Plant Projects to be Completed to Overcome Electric Energy Shortage
8.3.  Projected  Power Plant Capacity Development in JAVA– BALI
8.4.  Power Generation Project in the Outer Islands
9.    INDEPENDENT POWER PRODUCERS EXPECTED TO PLAY A BIGGER ROLE
9.1.  Background – The IPP Scheme
9.2.  Outcome of Renegotiations
9.3.  Coal – Fired Power Generation Plants to Play a Big Role 
9.4.  Private IPP Geothermal Plants  Expected to Get Notable Role
9.5.  Biodiesel Plant could be an Important IPP
10.   Prioritized electricity projectS by different govermnent  authorities
10.1.  Background
10.2.  PLN priority projects
10.3.  Long Listed Electricity Projects Presented by the Ministry of Finance to Prospective Creditors
10.4.  Priority Electricity Projects Offered by the Ministry of Energy and Mineral Resources (MEMR)
10.5.  Priority Electricity Project Offered During the Infrastructure Summit
11.   The electricity industry needs a lot ofimprovement
11.1.  Economic Background
11.2.  Investment Opportunities to Build Additional  Electricity Facilities
11.3.  Business Opportunities in Priority Power Plant Projects
11.4.  Business Opportunities in Project Offered in Infrastructure Summit Projects
11.5.  Business Opportunities in Transmission System Development
11.6.  Business  Opportunities  in  Distribution  System Development
11.7.  Prospect of Selling Coal to the Electricity Industry
11.8.  Closing Remarks  
DATA CONSULT
BUSINESS RESEARCH STUDIES REPORT
HOME       PRODUCTS      ABOUT US       CONTACTS      
Description          Report Outline            Order Form           
Web Page Maker, create your own web pages.